Lane restrictions on the U.S. 34 bridge in Burlington to continue until late summer

gr-bridge

Burlington, Ia-  Bridge work will be continuing on the US 34 Bridge in Burlington. The project involves pavement replacement at ramps on the Iowa and Illinois side, pavement replacement in the inside and outside lanes on the bridge in each direction, bridge cleaning, and bridge rehabilitation.

Construction started April 6, and is anticipated to be completed late summer, weather permitting, according to the Iowa Department of Transportation’s Fairfield construction office.

The bridge will remain open during this project. One lane of traffic in each direction, at minimum, will always be maintained.